1.212.642.4980     info@ansi.org    8:30am – 6pm EST, Monday – Friday
ANSI Standards Store

Browse ISO Standards
Browse IEC Standards

View all Publishers





View All Standards Packages



Search tips Search tips

IEC 61850-7-410 Ed. 2.0 b:2012

     

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.

Need more than one copy or have multiple people needing access,
an ANSI Site License Subscription may be the perfect solution.

Would you like to Email to a friend? If you would like to Email a friend a link to this item please    Login

Questions?