Most recent
AS/NZS 4911:2003
General conditions of contract for the supply of equipment without installation (FOREIGN STANDARD)
Sets out general conditions of contract for the supply of equipment which is purpose-built or manufactured, including equipment such as building elements. Where equipment is being supplied for use at different times or stages, separable portions may be appropriate. If installation is required, AS 4910-2003 for supply of equipment with installation, should be used.
Content Provider
Standards Australia [sai]