Historical

ASHRAE Guideline 0-2005

The Commissioning Process


The procedures, methods, and documentation requirements in this guideline describe each phase of the project delivery and the associated Commissioning Processes from pre-design through occupancy and operation, without regard to specific elements, assemblies, or systems, and provide the following: (a) overview of Commissioning Process activities, (b) description of each phase’s processes, (c) requirements for acceptance of each phase, (d) requirements for documentation of each phase, and (e) requirements for training of operation and maintenance personnel. These Commissioning Process guideline procedures include the Total Building Commissioning Process (TBCxP) as defined by National Institute of Building Sciences (NIBS) in its Commissioning Process Guideline 0.


CONTENT PROVIDER
American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. [ashrae]

Others Also Bought
The HVAC Commissioning Process
The HVAC Commissioning Process
Measurement of Energy and Demand Savings
Document History
Included in Packages
This standard is not included in any packages.
Amendments & Corrections
We have no amendments or corrections for this standard.