HVAC&R Commissioning

HVAC&R Commissioning

HVAC&R goes into not only heating, ventilation and air conditioning, but also refrigeration.

ASHRAE Guideline 1.2-2019

Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies

Provides requirements for the application of the Commissioning (Cx) Process described in ASHRAE Guideline 0.2 to existing heating, ventilating, air-conditioning, and refrigerating (HVAC&R) systems and assemblies. Dual units of measurement.

ASHRAE Guideline 1.3-2018

Building Operations and Maintenance Training for the HVAC&R Commissioning Process

The purpose of this guideline is to provide methodologies and formats for developing training plans, conducting training programs, and documenting training results for the operation and maintenance of building HVAC&R systems during the Commissioning (Cx) Process.

ASHRAE Guideline 4-2019

Preparation of Operations and Maintenance Documentation for HVAC&R Systems

Guides those responsible for the design, manufacturing, construction, commissioning, and Operation of building HVAC&R and on-site generation systems in the preparation and delivery of operations and maintenance (O&M) documentation that is a) simple to prepare and update, b) delivered on time, c) easy to use, and d) provides accurate and relevant information. Dual units of measurement.

ASHRAE Guideline 20-2010 (R2016)

Documenting HVAC&R Work Processes and Data Exchange Requirements

This Guideline a. defines methods for documenting use cases and data exchange requirements related to HVAC&R activities involving equipment, systems, design services, and other services over the lifecycle of capital facilities.

ASHRAE Guideline 20-2010 (R2016)

Documenting HVAC&R Work Processes and Data Exchange Requirements

This Guideline a. defines methods for documenting use cases and data exchange requirements related to HVAC&R activities involving equipment, systems, design services, and other services over the lifecycle of capital facilities.