Most recent

ANS/ASME 58.22-2015

Requirements for Low Power and Shutdown Probabilistic Risk Assessment


This standard sets forth the requirements for Low Power and Shutdown (LPSD) probabilistic risk assessments (PRA) and for LPSD Qualitative Risk Assessments (QLRA), both of which are used to support risk-informed decisions for commercial light water reactor nuclear power plants. This standard also prescribes a method for applying those parts of the requirements as necessary to support specific applications.  The discussion of requirements for LPSD PRAs is presented in Parts 1 through 10, and the discussion of the method for applying them is presented in Section 1.3. These requirements would be used for applications requiring quantitative risk-informed insights during low power and shutdown conditions. The discussion of requirements and a method for applying them for LPSD QLRA are presented in Part 11. These requirements would be used for applications in which qualitative risk-informed insights suffice, such as for plant configuration control during shutdown conditions.


CONTENT PROVIDER
American Society of Mechanical Engineers [asme]

Others Also Bought
Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Appli ...
Probabilistic Risk Assessment for Advanced Non-Light Water Reactor Nuclear Power Plants Publication
Severe Accident Progression and Radiological Release (Level 2) PRA Standard for Nuclear Power Plant Applications ...
Included in Packages
This standard is not included in any packages.
Document History
We have no document history for this standard.
Amendments & Corrections
We have no amendments or corrections for this standard.