Historical

ASTM E3010-15

Standard Practice for Installation, Commissioning, Operation, and Maintenance Process (ICOMP) of Photovoltaic Arrays

1.1 This practice details the minimum requirements for installation, commissioning, operations, and maintenance processes to ensure safe and reliable power generation for the expected life of the photovoltaic system. Specifically dealing with commercial photovoltaic installations, this practice covers a broad spectrum of designs and applications and is focused on the proper process to ensure quality.

1.2 This practice does not cover the electrical aspects of installation found in existing and national codes and does not replace or supersede details of electrical installation covered by the same. The practice does address the integration of best practices into design and construction.

1.3 This practice shall not dictate specific design criteria or favor any product or technology.

1.4 This practice shall be focused on the proper, documented process required to build and operate a quality PV plant as defined in Section 3.

1.5 Integration of best practices shall be relevant to this standard and promote a mechanism for rapid evolution and reaction to changes or events. Conformity assessment for PV power plants is being developed through the IEC System for Certification to Standards Relating to Equipment for Use in Renewable Energy Applications (IECRE System). Sandia Labs has developed several model documents that may be adopted as acceptable consensus standards through other standards development organizations.

CONTENT PROVIDER
ASTM International [astm]

Included in Packages
This standard is not included in any packages.
Document History
Revised By:
Amendments & Corrections
We have no amendments or corrections for this standard.