Most recent

AWWA C750-19 (R2023)

Transit-Time Flowmeters in Full Closed Conduits

The purpose of this standard is to provide the minimum requirements for transit-time flowmeters, including components, performance, calibration, and verification.

CONTENT PROVIDER
AWWA: American Water Works Association [awwa]

Others Also Bought
Magnetic Inductive Flowmeters
Cold-Water Meters—Electromagnetic and Ultrasonic Type for Revenue Applications
Cold-Water Meters for Residential Fire Sprinkler Systems in One- and Two-Family Dwellings and Manufactured Hom ...
Included in Packages
This standard is not included in any packages.
Document History
Revises:
Amendments & Corrections
We have no amendments or corrections for this standard.