Most recent

IEC 61850-7-410 Ed. 2.0 b:2012

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control


IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
 - the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
 - the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
 - most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
 This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.


CONTENT PROVIDER
International Electrotechnical Commission [iec]

Others Also Bought
Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping ...
Communication networks and systems for power utility automation - Part 3: General requirements
Communication networks and systems for power utility automation - Part 10: Conformance testing
Included in Packages
This standard is not included in any packages.
Document History
Amendments & Corrections