IEC/PAS 62382 Ed. 1.0 en:2004

Electrical and instrumentation loop check


describes the recommended steps to complete a loop check which comprises the activities between the completion of loop construction (including installation and point-to-point checks) and the start-up of the cold commissioning. This document is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, Panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems except as they relate to the loops being checked (i. e. a motor starter or a power supply to a 4-wire transmitter).


CONTENT PROVIDER
International Electrotechnical Commission [iec]

Others Also Bought
Catalog of ANSI standards
Activities during the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) ...
Included in Packages
This standard is not included in any packages.
Amendments & Corrections
We have no amendments or corrections for this standard.