Historical

IEEE 1025-1993 (R2011)

IEEE Guide to the Assembly and Erection of Concrete Pole Structures

Good practice that will improve the ability to assemble and erect self-supporting and guyed concrete pole structures for overhead transmission lines is presented. Construction aspects after foundation installation and up to the conductor stringing operation are covered. Some aspects of construction related to other materials use in concrete pole structures are covered, but the treatment is not complete. The guide is intended to be used as a reference source for parties involved in the ownership, design, and construction of transmission structures

CONTENT PROVIDER
Institute of Electrical and Electronics Engineers [ieee]

Others Also Bought
High-voltage fuses - Part 1: Current-limiting fuses
Design criteria of overhead transmission lines
High-voltage fuses. Current-limiting fuses (British Standard)
Included in Packages
This standard is not included in any packages.
Document History
Revises:
Amendments & Corrections
We have no amendments or corrections for this standard.