Customer Service:
Mon - Fri: 8:30 am - 6 pm EST

 Historical

IEEE C57.113-2010

Recommended Practice for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors

Wideband measurement of the apparent charge of partial discharges (PDs) that may occur in liquid-filled power transformers and shunt reactors excited by ac test voltages between 40 Hz and 400 Hz are discussed. The major components of the PD measuring circuit including the calibrator are specified in compliance with IEC 60270. The PD test procedure is described and recommendations for the evaluation of PD test results are presented.


Content Provider
Institute of Electrical and Electronics Engineers [ieee]


Others Also Bought

IEEE Guide for Acceptance and Maintenance of Insulating Oil in Equipment
IEEE Guide for Transformer Impulse Tests
Test Code for Liquid-Immersed Distribution, Power, and Regulating Transformers
Document History
Revises:
Revised By:
Included in Packages
This standard is not included in any packages.
Amendments & Corrections
We have no amendments or corrections for this standard.
ANSI Logo

As the voice of the U.S. standards and conformity assessment system, the American National Standards Institute (ANSI) empowers its members and constituents to strengthen the U.S. marketplace position in the global economy while helping to assure the safety and health of consumers and the protection of the environment.

CUSTOMER SERVICE
NEW YORK OFFICE
ANSI HEADQUARTERS