Most recent

AS/NZS 5139:2019 (R2026)

Electrical installations - Safety of battery systems for use with power conversion equipment (FOREIGN STANDARD)

AS NZS 5139 2019 specifies requirements for general installation and safety requirements for battery energy storage systems (BESSs), where the battery system is installed in a location, such as a dedicated enclosure or room, and is connected with power conversion equipment (PCE) to supply electric power to other parts of an electrical installation.

CONTENT PROVIDER
Standards Australia [sai]

Included in Packages
This standard is not included in any packages.
Document History
Revises:
Amendments & Corrections
We have no amendments or corrections for this standard.