Customer Service:
Mon - Fri: 8:30 am - 6 pm EST

 Most recent

IEC 61850-7-410 Ed. 2.1 b:2015

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

IEC 61850-7-410:2012+A1:2015 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific  to hydropower plants have been transferred to IEC 61850-7-4:2010;  - the definitions of logical nodes in this edition of IEC  61850-7-410 have been updated;
 - most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR  61850-7-510.
 This new edition of IEC 61850-7-410 includes additional  general-purpose logical nodes that were not included in IEC  61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.  This consolidated version consists of the second edition (2012)  and its amendment 1 (2015). Therefore, no need to order amendment in addition to this publication.


Content Provider
International Electrotechnical Commission [iec]


Document History
We have no document history for this standard.
Included in Packages
This standard is not included in any packages.
Amendments & Corrections
We have no amendments or corrections for this standard.
ANSI Logo

As the voice of the U.S. standards and conformity assessment system, the American National Standards Institute (ANSI) empowers its members and constituents to strengthen the U.S. marketplace position in the global economy while helping to assure the safety and health of consumers and the protection of the environment.

CUSTOMER SERVICE
NEW YORK OFFICE
ANSI HEADQUARTERS