Most recent

ANSI/ANS-2.23-2016 (R2020)

Nuclear Power Plant Response to an Earthquake


This standard describes actions that the owner of a nuclear power plant shall take to prepare for and respond to a felt earthquake at the plant(s), including the need for plant shutdown; actions to determine the readiness of the plant to resume operation; and those evaluations necessary to verify the long-term integrity of safety-related and important structures, systems, and components. It also includes a consensus definition of operating basis earthquake exceedance, beyond which U.S. regulations require plant shutdown. Application of this revised standard provides a comprehensive, balanced plan for the response of a nuclear power plant to an earthquake.


CONTENT PROVIDER
American National Standards Institute [ansi]

Others Also Bought
Criteria for Retrieval, Processing, Handling, and Storage of Records from Nuclear Facility Seismic Instrumenta ...
Included in Packages
This standard is not included in any packages.
Document History
Amendments & Corrections
We have no amendments or corrections for this standard.