Most recent

ASCE MOP 108-2014

Pipeline Design for Installation by Horizontal Directional Drilling


MOP 108 addresses the design of major pipeline or duct segments to be installed by horizontal directional drilling (HDD). Prepared by the Horizontal Directional Drilling Design Guideline Task Committee of the Technical Committee on Trenchless Installation of Pipeline Systems of the Pipeline Division of ASCE. This Manual of Practice addresses the design of major pipeline or duct segments to be installed by horizontal directional drilling (HDD). HDD is a trenchless excavation method that is accomplished in three phases and uses a specialized horizontal drilling rig with ancillary tools and equipment. Topics include predesign surveys, drilled path design, pipe design, construction impact, and as-built documentation. This new edition captures advances in drilling equipment, improvements for tracking, and considerations for using alternative pipe materials. MOP 108 is a guide for design engineers who have previous experience and knowledge of the HDD installation process and pipeline design methods.


CONTENT PROVIDER
ASCE: American Society of Civil Engineers [asce]

Others Also Bought
Pilot Tube and Other Guided Boring Methods
Horizontal Auger Boring Projects
Document History
We have no document history for this standard.
Included in Packages
This standard is not included in any packages.
Amendments & Corrections
We have no amendments or corrections for this standard.